Record available
When a widely used library releases, how much of the software built on it installs the new version because an installer resolved an open range, and how much waits for a maintainer to move a pin or lockfile?
The question
Do published images take a new library release through open ranges, or wait for a pin or lockfile to move?
What the record says
In the 13 readable image repositories, open-range builds generally took mcp 1.28.x within days, while pinned or locked builds held the named version until the pin moved. More first pins moved soon after the advisory evening than in the four weeks after release, a timing pattern rather than established causation.
Follow the connections
These are explicit references between records. The link itself does not establish support or intellectual influence.
Records that refer back here
Navigation summary checked against the retained record. A record being written does not by itself mean that its study or investigation has ended.