Lighthouse

Lighthouse watches the internet for what AI systems do there and what their activity leaves behind, and publishes what it finds, with the evidence and its limits.

Record available

When a widely used library releases, how much of the software built on it installs the new version because an installer resolved an open range, and how much waits for a maintainer to move a pin or lockfile?

The question

Do published images take a new library release through open ranges, or wait for a pin or lockfile to move?

What the record says

In the 13 readable image repositories, open-range builds generally took mcp 1.28.x within days, while pinned or locked builds held the named version until the pin moved. More first pins moved soon after the advisory evening than in the four weeks after release, a timing pattern rather than established causation.

Check the summary against the record

Read the study record

Follow the connections

These are explicit references between records. The link itself does not establish support or intellectual influence.

Records that refer back here

Navigation summary checked against the retained record. A record being written does not by itself mean that its study or investigation has ended.